Deliverables

Work Package 1: Overall project coordination
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D1.1 Project Handbook (*)  Report Confidential  2
D1.2 Data Management Plan and Quality Management Plan ORDP Confidential 4
D1.3 Project Management Collaborative Space (*) Other Confidential 4
D1.4 1st Technical Report to EC Report Confidential 12
D1.5 2nd Technical Report to EC Report Confidential 24
D1.6 3rd Technical Report to EC Report Confidential 36

ORDP: Open Research Data Pilot

(*) abstract available

Work Package 2: Definition of materials requirements
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D2.1 Preliminary selection of materials compositions and TES system predesign Report Public 4
D2.2 Key performance indicators (*) Report Confidential 5
D2.3 Specific scenarios (*) Report Confidential 5

(*) abstract available

Work Package 3 – Validation, cost & benefits analysis and dissemination
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D3.1 Intermediate Report on Ternary mixtures Report Confidential 10
D3.2 Material development progress report (*) Report Confidential 12
D3.3 Report on thermal properties of filler rock material for sensible heat storage Report Confidential 16
D3.4 Report on new CAC based concrete with enhanced thermal resistance Report Confidential 18
D3.5 Report on new Ca-ternary mixtures and nanoparticles Report Confidential 18
D3.6 Thermal behavior of new encapsulated PCMs Report Confidential 18
D3.7 New insulating materials solutions Report Confidential 19
D3.8 Report on Lithium mixtures Report Confidential 20

(*) abstract available

Work Package 4 Advanced materials combination and stability
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D4.1 Interaction characteristics of sensible-heat storage materials combinations Other Confidential 18
D4.2 Compatibility of metallic materials with PCMs and sensible-heat Ca-ternary salts Report Confidential 20
D4.3 Concrete long-term performance model Report Confidential 20

 

Work Package 5 – System Architecture design: simulation and materials monitoring
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D5.1 System configuration for thermocline concrete tank Report Confidential 25
D5.2 System configuration for concrete module Report Confidential 23
D5.3 Sensor monitoring design Report Confidential 25
D5.4 Lab scale monitoring system Report Confidential 25
D5.5 Thermocline and module TES designs and drawings Report Confidential 25

 

Work Package 6 – System integration and demonstration
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D6.1 Quality in-situ control report Report Confidential 28
D6.2 Test operation of the thermocline concrete tank and the modular concrete Report Confidential 36
D6.3 Data evaluation after demo phase Report Confidential 37

 

Work Package 7 – Validation, cost & benefits analysis and dissemination
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D7.1 Project visual identity and web-site Other Public 4
D7.2 Dissemination plan (*) Report Confidential 5
D7.3 Mid-term report on dissemination activities Report Public 21
D7.4 KPIs updated Report Confidential 36
D7.5 Techno-economical assessment of the new thermal energy storage concepts Report Confidential 38
D7.6 Summary report on validation activities Report Confidential 40
D7.7 Final report on dissemination activities Report Public 42

(*) abstract available

Work Package 8 – Exploitation of results and Bankability of applied materials solutions and system architectures
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D8.1 Exploitation Plan Intermediate – Materials Report Confidential 26
D8.2 Guidelines for materials processing and operation  Report Confidential 38
D8.3 Exploitation plan Report Confidential 40
D8.4 NewSOL bankability report Report Confidential 40
D8.5 One-year get-to-the-market roadmap Report Confidential 42

 

Work Package 9 – Ethics requiements
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D9.1 NEC – Requirement No. 1 (*) Ethics Confidential 3
D9.2 EPQ – Requirement No. 2 (*) Ethics Confidential 5

(*) abstract available