Deliverables

 

Work Package 1: Overall project coordination
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D1.1 Project_handbook (*)  Report Confidential 2
D1.2 Data Management Plan and Quality Management Plan (*) ORDP Confidential 4
D1.3 Project Management Collaborative Space (*) Other Confidential 4
D1.4 1st Technical Report to EC Report Confidential 12
D1.5 2nd Technical Report to EC Report Confidential 24
D1.6 3rd Technical Report to EC Report Confidential 36

ORDP: Open Research Data Pilot

(*) abstract available

Work Package 2: Definition of materials requirements
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D2.1 Preliminary selection of materials compositions and TES system predesign Report Public 4
D2.2 Key performance indicators (*) Report Confidential 5
D2.3 Specific scenarios (*) Report Confidential 5

(*) abstract available

Work Package 3 – Validation, cost & benefits analysis and dissemination
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D3.1 Intermediate Report on Ternary mixtures (*) Report Confidential 10
D3.2 Material development progress report (*) Report Confidential 12
D3.3 Report on thermal properties of filler rock material for sensible heat storage (*) Report Confidential 16
D3.4 Report on new CAC-based concrete with enhanced thermal resistance (*) Report Confidential 18
D3.5 Report on new Ca-ternary mixtures and nanoparticles (*) Report Confidential 18
D3.6 Thermal behaviour of new encapsulated PCMs (*) Report Confidential 18
D3.7 New insulating materials solutions (*) Report Confidential 19
D3.8 Report on Lithium mixtures (*) Report Confidential 20

(*) abstract available

Work Package 4 Advanced materials combination and stability
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D4.1 Interaction characteristics of sensible-heat storage materials combinations (*) Other Confidential 18
D4.2 Compatibility of metallic materials with PCMs and sensible-heat Ca-ternary salts (*) Report Confidential 20
D4.3 Concrete long-term performance model (*) Report Confidential 20

(*) abstract available

Work Package 5 – System Architecture design: simulation and materials monitoring
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D5.1 System configuration for thermocline concrete tank (*) Report Confidential 25
D5.2 System configuration for concrete module (*) Report Confidential 23
D5.3 Sensor monitoring design (*) Report Confidential 25
D5.4 Lab scale monitoring system (*) Report Confidential 25
D5.5 Thermocline and module TES designs and drawings (*) Report Confidential 25

(*) abstract available

Work Package 6 – System integration and demonstration
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D6.1 Quality in-situ control report (*) Report Confidential 28
D6.2 Test operation of the thermocline concrete tank and the modular concrete Report Confidential 36
D6.3 Data evaluation after demo phase Report Confidential 37

(*) abstract available

Work Package 7 – Validation, cost & benefits analysis and dissemination
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D7.1 Project visual identity and web-site Other Public 4
D7.2 Dissemination plan (*) Report Confidential 5
D7.3 Mid-term report on dissemination activities Report Public 21
D7.4 KPIs updated Report Confidential 36
D7.5 Techno-economical assessment of the new thermal energy storage concepts Report Confidential 38
D7.6 Summary report on validation activities Report Confidential 40
D7.7 Final report on dissemination activities Report Public 42

(*) abstract availablehttp://www.newsol.uevora.pt/_newsol/wp-content/uploads/2021/04/V1_D8_1_Exploitation-Plan-Intermediate-Materials.pdf

Work Package 8 – Exploitation of results and Bankability of applied materials solutions and system architectures
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D8.1 Exploitation Plan Intermediate – Materials (*) Report Confidential 26
D8.2 Guidelines for materials processing and operation  Report Confidential 38
D8.3 Exploitation plan Report Confidential 40
D8.4 NewSOL bankability report Report Confidential 40
D8.5 One-year get-to-the-market roadmap Report Confidential 42

 

Work Package 9 – Ethics requiements
Deliverable Number Deliverable Title Type Dissemination level Due Date (month)
D9.1 NEC – Requirement No. 1 (*) Ethics Confidential 3
D9.2 EPQ – Requirement No. 2 (*) Ethics Confidential 5

(*) abstract available